Location : Sicilia
Year : 2006
ENI project: Dirillo reservoir dredging – Sicily – Italy.
High depth dredging project – Pressure compensated Dragflow equipments
Features:
-
easy assembling by pins.
- quick power pack start-up by oil hoses fast connections.
- HY300 dredging pump coupled with EXHY35 excavators.
- moving by winches (propeller on request).
- 40 m dredging depth.
- fuel consumption: 80 litres per hour.
- delivery distance 800-900 m.
- solid production: 300 m3/h.
-
task performed in 4 months.
Dragflow: Mastering high depth dredging and deep sea mining